Merlo Roto and a second telehandler beside columns going up at Smith Campus, with steel beams staged in the foreground.

A leading steel erector in BC

Structural steel erection.

Red Iron specializes in the installation of institutional infrastructure: schools, aquatic centres, community centres, hospitals, correctional institutions, arenas, hotels, high-rise towers, industrial steel, silos, marine and fisheries infrastructure, defence sector field services, enclosures, and commercial steel.

We also provide the installation of miscellaneous metals packages, including guardrails, handrails, all types of stairs, canopies, trellises, ornamental steel, architectural features, and metal art sculpture installations.

A welder working a steel connection at Smith Campus.

02

Welding

CWB certified to CSA W47.1 Division 3.

A rigorous internal supervision and quality control program to produce the highest quality and most productive welding services possible.

A crane lowers a steel member down a long aisle of open-web joists at the Chilliwack Canadian Tire store.

03

OWSJ, Trusses and Girders.

Lobby and stair at the New West Aquatic Community Centre.

04

Stairs

Structural and architectural feature stairs from simple mezzanine access to complex spiral feature stairs we have the experience and knowledge to produce seamless installation and finish processes.

Plaza in front of the New West Aquatic Community Centre.

05

Miscellaneous metals

Canopies, Trellises, Guard rails, hand rails, stanchions, grating, brick ledgers, DC Posts, bollards, architectural and ornamental structures

Request a quote

Steel trusses during erection at the New West Aquatic Community Centre.

For fabricators

We integrate seamlessly with your team, coordinating design and details, phasing plans and erection methodology. Our field crews deliver on schedule and budget. Quality is assured and safety guides every step of the way.

Equipment

Premium equipment fleet

Merlo Roto in front of erected roof steel at Smith Campus.

Merlo Roto 50.35 S-Plus

Red Iron is the first steel erector in BC to deploy the Merlo Roto 50.35 S-Plus.

In use since 2025.

Lifting and material handling

  • Merlo 50.17 telehandler (purchased Nov 2026).
    Red Iron's Merlo 50.17 telehandler on site
  • JLG 1055 telehandler.

Aerial work platforms

  • Genie Z62 boom lift.
  • JLG scissor lifts.
  • Snorkel SJ66T boom lifts, outfitted with inverter welders in the basket.

Welding

  • Lincoln Ranger EFI mobile welders.
  • inverter welders.

Support and site

  • a fleet of company trucks.
  • job site offices.
  • A vast array of erection and welding equipment.
Lincoln Ranger 330MPX engine welder in use on site
Lincoln Ranger 330MPX engine welder with Red Iron decal
Lincoln Power MIG 210 MP inverter welder mounted in a boom-lift basket
Lincoln Ranger engine welder being hoisted on site
Lincoln Ranger EFI engine welder in a truck bed
Lincoln Ranger EFI engine welder on a slab