Smith Campus Middle School, at 21020 76 Avenue in Langley’s Willoughby neighbourhood, shares the Province’s first joint campus in the Lower Mainland with Emery Dosdall Secondary, creating 2,800 student spaces — 900 in the middle school and 1,900 in the secondary — in what the Province has called the largest public-school infrastructure project in British Columbia’s history. Thinkspace is the architect and Turner Construction is the general contractor. Both schools are scheduled to open in September 2027, and the middle school will include a neighbourhood learning centre for childcare.
Red Iron, working with fabricator Profab Steel (1998) Ltd., erected the structural steel and all of the mass timber, including the mass-timber stairwell.
“Red Iron has been an absolute pleasure to work with throughout the job. … I would gladly recommend them for future structural steel work and would welcome the opportunity to work with their team again.”
Scope
- Erection of all mass timber for the middle school, including the mass-timber stairwell
- Erection of all structural steel, including roof framing and gym trusses
- Field welding and bolt-up of the steel frame
- Temporary and permanent bracing, and a crane layout for the gym trusses
- Member placement with the Merlo Roto 50.35, alongside conventional cranes and boom lifts
On the record
- Address: 21020 76 Avenue, Langley. Owner: Langley School District.
- General contractor: Turner Construction.
- Fabricator: Profab Steel (1998) Ltd.
- Red Iron erected all of the mass timber and all of the structural steel, not the connections alone.
- The mass-timber stairwell was featured in WELD Magazine, Summer 2026.
- Described in our WELD Magazine questionnaire as part of the largest public-school infrastructure project in B.C.’s history.