təməsew̓txʷ Aquatic and Community Centre, a hən̓q̓əmin̓əm̓ name meaning “sea otter house,” is the City of New Westminster’s aquatic and community centre at 65 East Sixth Avenue. Designed by hcma architecture + design and built by Heatherbrae Builders, the 10,644-square-metre facility opened in spring 2024 and was Canada’s first completed aquatic centre to achieve the Zero Carbon Building–Design Standard.
The building is a hybrid of steel, concrete and mass timber, with a folded-plate CLT and steel roof over the eight-lane, 50-metre lap pool, CLT panels on cranked steel beams over the leisure pool, and a free-floating helical stair in the lobby. It also includes two gymnasiums, a fitness centre, licensed childcare and civic plazas.
Red Iron erected Approx. 680 tons of structural steel fabricated by West Coast Steel, including the 140-foot cranked roof beams, field-spliced 80-foot HSS trusses over the pools, the circular lobby stair, and plaza shade structures.
Scope
- Structural steel for the new facility
- Main trusses and platforms over the pool areas, including field CP-spliced 80-foot HSS trusses and hanging catwalks
- 140-foot cranked roof beams
- Circular feature stair in the lobby
- North and south plaza shade structures
- Wells, platforms, and a raised filter-room platform
- Girts, soffit HSS, and partition-wall supports
- Steel stairs and ships ladders
- Basketball backstop supports, roof anchors, and overhead-door steel
- Channel at the leading edge of the leisure-pool wood roof, plus roof curbs, deck-opening frames, and edge angles for metal deck
On the record
- Approx. 680 tons of steel. West Coast Steel fabricated it.
- Free-standing steel, concrete, and glulam community centre.
- 140-foot cranked roof beams. Eighty-foot HSS trusses, field CP-spliced over the pools, with hanging catwalks.
- Circular lobby stair. Pool steel sequenced in zones.